That is a fair summary. I pondered landing a code that provided an empty job, then over a few branches, move the existing merge code into it, then land a ui branch to enable it. I could then schedule the many secondary bugs to make merging a complete process. I imagined doing about 2 branches a release until it was complete.
That is a fair summary. I pondered landing a code that provided an empty job, then over a few branches, move the existing merge code into it, then land a ui branch to enable it. I could then schedule the many secondary bugs to make merging a complete process. I imagined doing about 2 branches a release until it was complete.