[SWARM][8.0] ironic_deploy_ceph: ironic_post_swift_key.rb timeout

Bug #1681842 reported by Vladimir Jigulin
6
This bug affects 1 person
Affects Status Importance Assigned to Milestone
Mirantis OpenStack
Confirmed
Medium
MOS Maintenance

Bug Description

Steps to reproduce:
1. Create cluster
2. Add 3 node with controller+ironic+ceph-osd role
3. Add 1 node with compute role
4. Add 1 nodes with ironic role
5. Deploy the cluster

Actual result:
 message Deployment has failed. Method granular_deploy. Failed to execute hook 'ironic_post_swift_key' command: cd / && ruby /etc/puppet/modules/osnailyfacter/modular/astute/ironic_post_swift_key.rb
Task: 17a3425e-bdea-4d86-b5b3-788cc11c15fe: shell timeout error: execution expired
Task timeout: 180, Retries: 3
---
uids:
- '1'
parameters:
  retries: 3
  cmd: ruby /etc/puppet/modules/osnailyfacter/modular/astute/ironic_post_swift_key.rb
  cwd: /
  timeout: 180
  interval: 20
priority: 1300
fail_on_error: true
type: shell
id: ironic_post_swift_key
More astute logs: http://paste.openstack.org/raw/606156/

Reproducibility: 4 fails in a row
Last pass: Nov 10, 2016
Fails: Apr 7, 2017 => Apr 13

Similar bug: https://bugs.launchpad.net/mos/+bug/1533578

Revision history for this message
Vladimir Jigulin (vjigulin) wrote :
description: updated
summary: - [SWARM][8.0] ironic_deploy_ceph: ironic_post_swift_key.rb timout
+ [SWARM][8.0] ironic_deploy_ceph: ironic_post_swift_key.rb timeout
Changed in mos:
assignee: nobody → MOS Maintenance (mos-maintenance)
importance: Undecided → Medium
status: New → Confirmed
Revision history for this message
Vladimir Jigulin (vjigulin) wrote :

failures continue on 8.0 MU-4 iso #04/17/17 14:36

To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.